Dec 28, 2020 Originally commissioned in 1997 as a heap leach operation, Tarkwa built its first CIL plant, with a design throughput of 4.2 Mt/y, in 2004. The mine initiated an expansion in 2007 to nearly triple that capacity to 12.3 Mt/y, and that plant was commissioned in 2009. More. International operations Tarkwa Gold Mine Gold Fields.